Bridge ‘Pont de Recouvrance’ Brest (France)

Brest, France

edilon)(sedra ERS

Location France, Brest

Project Pont de Recouvrance

Length 2 x 200 m track on fixed and moveable bridge deck

Application 2011

Rail profile 35 GPB (low profile)

Details Installation of tramway track on a mobile bridge. Installation according to drawings of SYSTRA, project owner with technical assistance of edilon)(sedra.

Target Low building height and weight reduction.

Client CUB (Brest Transport Authority)

edilon)(sedra | Nijverheidsweg 23 | NL-2031 CN Haarlem | The Netherlands | T: +31 / (0)23 / 531 95 19 | F: +31 / (0)23 / 531 07 51 | Contact