Hemtunnel Zaandam (The Netherlands)

Zaandam, (The Netherlands)

edilon)(sedra Corkelast® EBS

SPECIFICATIONS

Location Zaandam, The Netherlands

Project Hemtunnel Zaandam

Length 2 x 1.550 m track

Application 2017

Rail profile 54E1

Details edilon)(sedra Corkelast® EBS (Embedded Block System)

Target The Corkelast® based block system offers an easy and flexible installation and therefore a very short out-of-service period. Furthermore EBS is applied because of its durable characteristics. The system ensures a strong reduction of dynamic loads, vibrations and excellent electrical insulation which is important in areas with moisture and/or risk for corrosion.

Client VolkerRail

edilon)(sedra | Nijverheidsweg 23 | NL-2031 CN Haarlem | The Netherlands | T: +31 / (0)23 / 531 95 19 | F: +31 / (0)23 / 531 07 51 | Contact us