Zaandam, (The Netherlands)
edilon)(sedra Corkelast® EBS
SPECIFICATIONS
Location Zaandam, The Netherlands
Project Hemtunnel Zaandam
Length 2 x 1.550 m track
Application 2017
Rail profile 54E1
Details edilon)(sedra Corkelast® EBS (Embedded Block System)
Target The Corkelast® based block system offers an easy and flexible installation and therefore a very short out-of-service period. Furthermore EBS is applied because of its durable characteristics. The system ensures a strong reduction of dynamic loads, vibrations and excellent electrical insulation which is important in areas with moisture and/or risk for corrosion.
Client VolkerRail