Kaohsiung (Taiwan)
edilon)(sedra Corkelast® SDS-M
SPECIFICATIONS
Location Kaohsiung, Taiwan
Project Kaohsiung, Line 2 (KLRT-II)
Length 28.000 m of track (in-street running track, turf track, level crossing); 28 off switches type R25 and R50
Application 2017 – 2019
Rail profile 54G2
System edilon)(sedra SDS-M (Sound Damping System – Modular)
Details
– proven continuous resilient rail support system according to EN 13481-5
– fully encapsulation of the rails
– high amount of vibration attenuation (dBv)
– high amount of electrical insulation (DIN 50122-2)
– designed for tuned track resonant frequency (+/- 25 Hz.)
– designed for TopDown installation method, easy and rapid installation
– no use of mechanical rail fixations or steel tie-bars
Client Chan Chun Construction Company