Level Crossing System Seoul (South Korea)

Soul, (South Korea)

edilon)(sedra Corkelast® LCS

Location Seoul, South Korea

Project First edilon)(sedra Corkelast® LCS and Corkelast® STS project in South Korea

Length 40 m track (monolithic slab, with a 10 m level crossing section and a 30 m dedicated slab track section)

Application October 2018

Rail profile JIS50 N

Details edilon)(sedra Corkelast® LCS (Level Crossing System)

Client KRNA (Korea Rail Network Authority)

edilon)(sedra | Nijverheidsweg 23 | NL-2031 CN Haarlem | The Netherlands | T: +31 / (0)23 / 531 95 19 | F: +31 / (0)23 / 531 07 51 | Contact