Port of Tauranga (New Zealand)

Tauranga (New Zealand)

edilon)(sedra Corkelast® LCS

SPECIFICATIONS

Location Tauranga, New Zealand

Project Renovation old level crossing at the Port of Tauranga

Length 66 m track

Application 2017

Rail profile NZR50

Details edilon)(sedra Corkelast® LCS (Level Crossing Systems)

Target Short period of installation and thus minimal possession time. Optimal accessibility and safety. Corkelast® LCS provides a stable, durable and continuous rail support. This addresses forces and tension caused by passing heavy rail and heavy road traffic and physical influences such as temperature changes.

Client Port of Tauranga

edilon)(sedra | Nijverheidsweg 23 | NL-2031 CN Haarlem | The Netherlands | T: +31 / (0)23 / 531 95 19 | F: +31 / (0)23 / 531 07 51 | Contact us