Refurbishment of tram track Belgrade (Serbia)

Belgrade (Serbia)

edilon)(sedra Corkelast® SDS

Location Belgrade, Serbia

Project Vojvode Stepe – refurbishment of tram track

Length 10.000 m

Application 2015

Rail profile Ri60

System edilon)(sedra SDS (Sound Damping System), durable medium stiffness sytem with water tight sealant edilon)(sedra Jointelast STP

Target Refurbishing of heavily used Belgrade tramway which is integrated in an asphalt top layer. Requirement was to have a water tight sealant.

Client City of Belgrade

edilon)(sedra | Nijverheidsweg 23 | NL-2031 CN Haarlem | The Netherlands | T: +31 / (0)23 / 531 95 19 | F: +31 / (0)23 / 531 07 51 | Contact