Einträge von edilon)(sedra

Designing your railway project with BIM

Did you know that the edilon)(sedra Application Engineering department can help you apply BIM objects of our rail fastening systems to your BIM project? A fast, accurate and efficient way to design your railway project! We recently applied BIM in projects Valencia line 10 and depot En Chardon. Valencia line 10 FGV is the first […]

Installation Corkelast® EBS for Warsaw M2 at full speed!

After a period of preparatory work, our contracting partner Gülermak has started the installation of the edilon)(sedra Corkelast® Embedded Block System (EBS) for the 2nd extension of Warsaw Metro Line 2. The first EBS units are in situ installed in the slab track! The total project includes 20 km of EBS single track, including 8 […]

Renovierung von drei Schwerlast-Eisenbahnbrücken in Ungarn

Im ungarischen Budapest arbeiten Bauunternehmer mit Hochdruck an der Sanierung von drei Brücken der Südbahnverbindung. Dieses Renovierungsprojekt ist Teil des städteübergreifenden Projektes Südring-Bahn und kann als technische Meisterleistung bezeichnet werden. Auf allen drei Brücken wird edilon)(sedra Corkelast® ERS als Gleissystem installiert, und zwar auf insgesamt 1.498 m. Die Duna Aszfalt Kft. wird die Gleise verlegen, […]

Projekt-Update der Jokeri-Linie, Finnland

Im Newsletter des letzten Jahres haben wir den Start des Projekts der Jokeri-Linie in Finnland angekündigt. Diese Linie wird zwischen Itäkeskus in Helsinki und Keilaniemi in Espoo gebaut und soll 2023 in Betrieb gehen. Nach gründlichen Vorbereitungsarbeiten mit allen Projektpartnern sind die Produktlieferungen und Installationsarbeiten derzeit in vollem Gange. Wir liefern verschiedene Typen unseres SDS […]

Extension to Vitoria-Gasteiz tram network – It doesn’t get any greener!

edilon)(sedra has been awarded the contract to supply track systems for the 5 km extension of the Vitoria-Gasteiz tramway for contractor UTE Tecsa Altuna and end-customer Euskal Trenbide Sarea. Vitoria-Gasteiz is one of the most environmental orientated cities in Spain. Investments in green development to improve infrastructure, are supported by both the local government and […]

New Managing Director edilon)(sedra

Oliver Dolder: Managing Director edilon)(sedra We are pleased to announce the appointment of Oliver Dolder to the role of Managing Director of the edilon)(sedra Group, starting from 4 January 2021. Oliver is a seasoned professional with an accomplished and distinguished career in the international rail infrastructure industry. In his previous position Oliver led Pandrol’s global […]

The importance of electrically insulated tracks

A high electrical insulation of the track infrastructure is an important aspect, especially for urban transport modes, such as for light rail and metros. If the railway system is not adequately insulated from the ground, this can lead to damaged tracks and pipes laid underground. Stray currents can cause considerable corrosive damages to the rails, […]

Stadtbahnprojekt Red Line, Tel Aviv

Wenn wir eine Rolle in den verschiedenen gleisbezogenen Projektdisziplinen spielen, von der technischen Beratung über das Gleisdesign bis hin zur Lieferung und Installation von Schienensystemen. Dann sind wir in Bestform! Unser oberstes Ziel: Die Bereitstellung nachhaltiger Schienensysteme. Nehmen wir zum Beispiel das aktuelle Stadtbahnprojekt Red Line in Tel Aviv, Israel. Zunächst beriet edilon)(sedra Iberica die […]

Corkelast® ERS auf neuer Botlek-Brücke

Die neue Botlek-Hubbrücke über die Maas im Rotterdamer Hafen setzt Maßstäbe: Sie hat die größte Hubmasse der Welt und bietet den schnellsten Hub-/Senkzyklus. Die Brücke soll eine Lebensdauer von 100 Jahren haben und 900.000 Hebevorgängen ohne Beschädigung standhalten. Die neue Botlek-Brücke ist eine kombinierte Schienen- und Straßenbrücke, die im Rahmen einer umfassenden Renovierung der Autobahn […]

Neue Kazungula-Eisenbahnbrücke kurz vor der Fertigstellung!

In naher Zukunft wird das Reisen zwischen Sambia und Botswana einfacher, reibungsloser und schneller, wenn die neue Straßen- / Eisenbahnbrücke von Kazungula, die derzeit über die Gewässer des Sambesi fertiggestellt wird, für die öffentliche Nutzung in Betrieb genommen wird. Nach Fertigstellung wird die Brücke mit der Mosetse-Kazungula-Eisenbahn verbunden. Das 923 m lange Meisterwerk verbindet die […]