News
Finch West LRT

Finch West LRT: brand new transit access to northwest Toronto

edilon)(sedra has been selected by Colas Rail Canada, a subcontractor of the Mosaic Transit Group consortium to supply the Corkelast® ERS to embed rails for the mainline track of the new Metrolinx Finch West LRT Line in Toronto, Canada.

The edilon)(sedra Corkelast®  ERS (Embedded Rail System) will be installed in all sections of the track including stations, stops and bridges. Track contractor Colas Rail will carry out the track installation works.

The Finch West LRT Line, which is owned by Metrolinx will be operated by Toronto Transit Commission and maintained by Mosaic Transit Group. When in service, it will provide brand new transit access to the northwest area of Toronto, with connections to the current TTC subway Line 1, as well as York and Peel Regions transit services.

The new line will have 18 stops between Humber College and the Finch West subway station and is planned to be operational in 2023. We will keep you informed!

Finch West LRT

Visual of a future Finch West Light Rail station portal. Source: Mosaic Transit Group

Comments are closed.

edilon)(sedra | Nijverheidsweg 23 | NL-2031 CN Haarlem | The Netherlands | T: +31 / (0)23 / 531 95 19 | F: +31 / (0)23 / 531 07 51 | Contact