PODCAST-GetOnTheTrack

Episode 2 – Metro track construction in extreme climatic conditions

Welcome to Get On The Track! In our Get On The Track podcast series we would like to share with you the experiences and challenges of our customers. In this podcast episode, we will jump into the track construction of a Metro project in extreme climatic conditions.

For track construction companies these project types will throw many challenges during the phases of preparation and execution. High and low air temperatures and high humidity as well as possible heavy rainfalls must be considered whilst finding the best timing for the project planning regarding concrete pouring of the ballast less tracks as well as for the rail welding.

Click on the play button to start the story and learn more…

Episode 1 – Water ingress to track infrastructure in metro tunnels

Welcome to Get On The Track! In our Get On The Track podcast series we would like to share with you the experiences and challenges of our customers.

In this first podcast you will hear a story about a common problem in metro tunnels:  the problem of water ingress to the track infrastructure. For many metro operators the challenge is to keep a very old network alive. They are looking for a suitable solution for the refurbishment of worn-out bi-block slab track systems with a need to realize the replacement during very short possession times.

Click on the play button to start the story and learn more about our Corkelast® EBS-RF RetroFit solution!

More info:
Leaflet
Project video

edilon)(sedra | Nijverheidsweg 23 | NL-2031 CN Haarlem | The Netherlands | T: +31 / (0)23 / 531 95 19 | F: +31 / (0)23 / 531 07 51 | Contact