News

Realisation terminal New Arken, Gothenburg

In the Swedish city of Gothenburg a new combi terminal ‘New Arken’ has been realized within 3 weeks according to planning, despite the very poor weather conditions.

For track 903, main contractor NCC awarded edilon)(sedra the assignment to realize 622.5 meters of Corkelast® HSTS (Heavy rail Slab Track System), a combination of prefabricated concrete slabs, type ‘New Arken’ and the edilon)(sedra Corkelast® ERS (Embedded Rail System).

Download the PRESS RELEASE.

Comments are closed.

edilon)(sedra | Nijverheidsweg 23 | NL-2031 CN Haarlem | The Netherlands | T: +31 / (0)23 / 531 95 19 | F: +31 / (0)23 / 531 07 51 | Contact us