Start collaborative project Uithof line Utrecht, The Netherlands

edilon)(sedra started the engineering, delivery and installation of a number of rail systems for the new 8 km Uithof line project in Utrecht, the Netherlands.

The Uithof line is a new tram line from Utrecht Central Station to Utrecht Science Park De Uithof, which will become operational mid-2018. In close co-operation with the Uithof Line project partners BAM and Arcadis, different types of edilon)(sedra Corkelast® Embedded Rail Systems are installed. Some of which are executed with concrete or steel channels, or with concrete slabs. Both top-down and bottom-up installation methods are applied.

The edilon)(sedra scope of work includes the engineering, the delivery of materials and equipment and the installation of 7 kms of balastless single track. This large tram project shows once again the great trust that edilon)(sedra – with its technologically leading embedded rail system technology – enjoys in the railway industry. It further confirms the satisfaction of our customers and partners with our safe and durable rail systems and our performance.

Recently installed Corkelast® edilon)(sedra ERS (Embedded Rail System) for Uithof Line

Recently installed Corkelast® edilon)(sedra ERS (Embedded Rail System) for Uithof Line

 

Installation of Corkelast® ERS Top-down (Embedded Rail System)

Installation of Corkelast® ERS Top-down (Embedded Rail System)

 

Installation of Corkelast® ERS Top-down (Embedded Rail System)

Installation of Corkelast® ERS Top-down (Embedded Rail System)

Comments are closed.