Einträge von edilon)(sedra

Schnelle & einfache Sanierung von Holzschwellen

Das untenstehende Video zeigt Ihnen ein anschauliches Beispiel einer Holzschwellensanierung mit edilon)(sedra Dex®-G 20 / Dex®-ESM 20-40C Entdecken Sie die Vorteile der Holzsschwellensanierung – System edilon)(sedra: Verlängerung der Lebensdauer von Holzschwellen Längere Zeitintervalle zwischen den geplanten Wartungsarbeiten an der gesamten Strecke Erhöhung der Gleisverfügbarkeit Senkung der Lebenszykluskosten Allgemeine Verlängerung der Lebensdauer von Gleisen Effektivere Nutzung […]

Metro Line 2 Warsaw: optimal noise & vibration control

A new milestone for the largest metro project in Eastern Europe! The western section of Metro Line 2 in Warsaw has been taken into operation, including two new stations Bemowo and Ulrychów. On 30 June 2022, the official opening took place at the Bemowo station, by Mayor of Warsaw Rafał Trzaskowski and by EU Commissioner […]

3. Platz für edilon)(sedra beim Innovationspreis des Bayerischen Bauindustrieverbandes

edilon)(sedra ist immer einen Schritt voraus, wenn es um die Entwicklung von innovativen Gleisbefestigungssystemen geht und gewinnt mit einer nachhaltigen Idee den 3. Platz beim Innovationspreis des Bayerischen Bauindustrieverbandes e.V. Auf der Suche nach einer unkonventionellen Lösung für Verkehrsflächen im innerstädtischen Bereich haben die beiden Unternehmen edilon)(sedra GmbH und Asphaltbau und Mischwerke GmbH ihre Kernkompetenzen […]

Trackelast® for tram tracks on Carolabridge in Dresden

Sharing and utilizing our expertise in the field of track elasticity makes our heart beat faster! A good example of this is the recent rehabilitation of the tram tracks on the reinforced concrete ‘Carola bridge‘ in Dresden, Germany. For this project, we engineered and installed 1.700 project specific edilon)(sedra Trackelast® BPP/RPU/6000 baseplate pads (colored orange […]

Green tracks for Mannheim’s longest tram line

The Final Spurt on Mannheim’s longest tram line…Now just to water the track to make the grass grow! It took round about 80 days of construction time to renew the track system of the light rail line 1 which was originally installed in 1979 between Casterfeld Straße and Neckarauer Straße. The rnv (Rhein-Neckar-Verkehr GmbH) deliberately […]

Strong stray current isolation performance Corkelast® ERS Canberra

Formally reported measurements to the Stray Current Working Group, show the Canberra embedded rail system continues to prove an excellent seasonal trend. Rail-to-earth resistance results in the wet surpass 20 ohm.km, while dry conditions show phenomenal readings in the order of 60 to 80 ohm.km. edilon)(sedra Australia supplied the Corkelast® Embedded Rail System (ERS). The ERS track […]

Corkelast® EBS installation on a steel-concrete railway bridge in Poland

Constructionheight, constructionspeed and electrical insulation are important challenges when it comes to the design and installation of rail tracks for bridges. Ballastless track systems are a frequently chosen solution when it comes to these type of challenges. Take our Corkelast® Embedded Block System EBS, for example, which was recently installed on this steel-concrete PKP railway […]

edilon)(sedra, technical partner for the mega rail project Toluca, Mexico

Observe the installation of our DFS rail fastening system on several viaducts, standing over 35 meters above the ground. A special technical challenge that really demonstrates the rail engineering competence of edilon)(sedra! Lead engineers from SENER selected the edilon)(sedra DFS-FF ASB system for one of the largest railway projects in Mexico: the new commuter railway […]